{"id":15201,"date":"2023-09-15T16:23:00","date_gmt":"2023-09-15T13:23:00","guid":{"rendered":"https:\/\/uabio.org\/?p=15201"},"modified":"2023-10-12T23:28:42","modified_gmt":"2023-10-12T20:28:42","slug":"najbilsha-u-sviti-ustanovku-zridzhennya-biometanu-shvetsiya","status":"publish","type":"post","link":"https:\/\/uabio.org\/en\/news\/15201\/","title":{"rendered":"The world&#8217;s largest biomethane liquefaction plant | Sweden"},"content":{"rendered":"\n<p><em>The powerful company <em><a href=\"https:\/\/www.biokraft.com\/\">Biokraft<\/a><\/em> is commissioning the world&#8217;s largest biomethane liquefaction plant and doubling its Bio-LNG production capacity.<\/em><\/p>\n\n\n\n<p>The newly built liquefaction plant is located directly adjacent to the digesters in S\u00f6dert\u00f6rn and converts biomethane into liquid through cooling. The first batch of bio-LNG has already been delivered \u2014 two containers (34 tons in total) of bio-LNG, which will be used for the needs of freight transport in Northern Europe. This amount of biomethane is enough to drive fossil-free with a fully loaded long-haul truck for approximately 100,000 kilometers.<\/p>\n\n\n\n<figure class=\"wp-block-gallery has-nested-images columns-default is-cropped wp-block-gallery-1 is-layout-flex wp-block-gallery-is-layout-flex\">\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"500\" height=\"281\" data-id=\"15203\" src=\"https:\/\/uabio.org\/wp-content\/uploads\/2023\/09\/default_Image_by_Biokraft_1693307787.jpg\" alt=\"\u041a\u043e\u043c\u043f\u0430\u043d\u0456\u044f Biokraft \u043f\u043e\u0441\u0442\u0430\u0432\u0438\u043b\u0430 \u043f\u0435\u0440\u0448\u0443 \u043f\u0430\u0440\u0442\u0456\u044e bio-LNG (\u0431\u0456\u043e\u043c\u0435\u0442\u0430\u043d\u0443)\" class=\"wp-image-15203\"\/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"800\" height=\"533\" data-id=\"15204\" src=\"https:\/\/uabio.org\/wp-content\/uploads\/2023\/09\/a450569ff9c8a764_800x800ar.png\" alt=\"\u041a\u043e\u043c\u043f\u0430\u043d\u0456\u044f Biokraft \u043f\u043e\u0441\u0442\u0430\u0432\u0438\u043b\u0430 \u043f\u0435\u0440\u0448\u0443 \u043f\u0430\u0440\u0442\u0456\u044e bio-LNG (\u0431\u0456\u043e\u043c\u0435\u0442\u0430\u043d\u0443)\" class=\"wp-image-15204\" srcset=\"https:\/\/uabio.org\/wp-content\/uploads\/2023\/09\/a450569ff9c8a764_800x800ar.png 800w, https:\/\/uabio.org\/wp-content\/uploads\/2023\/09\/a450569ff9c8a764_800x800ar-768x512.png 768w\" sizes=\"auto, (max-width: 800px) 100vw, 800px\" \/><\/figure>\n<\/figure>\n\n\n\n<h4 class=\"wp-block-heading\">Characteristics<\/h4>\n\n\n\n<div class=\"wp-block-columns is-layout-flex wp-container-core-columns-is-layout-9d6595d7 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<ul class=\"wp-block-list\"><li><strong>Production capacity: <\/strong>220 GWh per year (50 tons of bio-LNG per day).<\/li><li><strong>Terms of project implementation: <\/strong>2 years.<\/li><\/ul>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<ul class=\"wp-block-list\"><li><strong>Cost:<\/strong> about 28 million euros.<\/li><li><strong>Raw material: <\/strong>digesting collected food scraps and slaughterhouse waste from municipalities in Greater Stockholm.<\/li><\/ul>\n<\/div>\n<\/div>\n\n\n\n<p><em>Please, note that <a href=\"https:\/\/saf.org.ua\/en\/news\/1745\/\" target=\"_blank\" rel=\"noreferrer noopener\">the full material about this important event is available on the Sustainable Agribusiness Platform (SAF)<\/a>, for which our team participates in the preparation of materials.<\/em><\/p>\n\n\n\n<div class=\"wp-block-image\"><figure class=\"aligncenter size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"770\" height=\"500\" src=\"https:\/\/uabio.org\/wp-content\/uploads\/2023\/09\/sodertorbiolng.jpg.webp\" alt=\"\u041a\u043e\u043c\u043f\u0430\u043d\u0456\u044f Biokraft \u043f\u043e\u0441\u0442\u0430\u0432\u0438\u043b\u0430 \u043f\u0435\u0440\u0448\u0443 \u043f\u0430\u0440\u0442\u0456\u044e bio-LNG (\u0431\u0456\u043e\u043c\u0435\u0442\u0430\u043d\u0443)\" class=\"wp-image-15202\" srcset=\"https:\/\/uabio.org\/wp-content\/uploads\/2023\/09\/sodertorbiolng.jpg.webp 770w, https:\/\/uabio.org\/wp-content\/uploads\/2023\/09\/sodertorbiolng.jpg-768x499.webp 768w\" sizes=\"auto, (max-width: 770px) 100vw, 770px\" \/><\/figure><\/div>\n\n\n\n<h4 class=\"wp-block-heading\">\u041f\u0435\u0440\u0435\u0432\u0430\u0433\u0438 \u0437\u0440\u0456\u0434\u0436\u0435\u043d\u043d\u044f<\/h4>\n\n\n\n<p>The company\u2019s potential market is significantly broadened towards heavy road transport, shipping and industry thanks to liquefaction. Bio-LNG has a high energy content per unit volume and can be transported long distances at a reasonable cost to meet a strong demand in Northern Europe.<\/p>\n\n\n\n<h4 class=\"wp-block-heading\">Full capacity output<\/h4>\n\n\n\n<p>Today, the Stockholm bio-LNG project will be in the commissioning phase for some months while production is scaled, and functions and delivery parameters are tested. The company predicts that the facility will operate at full capacity by the end of the year.<\/p>\n\n\n\n<p>Read more <a href=\"https:\/\/saf.org.ua\/en\/\" target=\"_blank\" rel=\"noreferrer noopener\">on the SAF platform<\/a>!<\/p>\n\n\n\n<hr class=\"wp-block-separator is-style-wide\"\/>\n\n\n\n<p><em>We remind you that UABIO is a partner of&nbsp;<a href=\"https:\/\/saf.org.ua\/en\/about\/\" target=\"_blank\" rel=\"noreferrer noopener\"><em>the Sustainable agribusiness platform (SAF<\/em>)<\/a>.<\/em><\/p>\n\n\n\n<p>SAF is a communication platform that brings together agribusiness stakeholders and aims to establish strong links between market players and introduce sustainable approaches in agriculture.<\/p>\n\n\n\n<p>For this platform, our team prepares verified professional content on the bioenergy sector.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The powerful company Biokraft is commissioning the world&#8217;s largest biomethane liquefaction plant and doubling its Bio-LNG production capacity. The newly built liquefaction plant is located directly adjacent to the digesters in S\u00f6dert\u00f6rn and converts biomethane into liquid through cooling. The first batch of bio-LNG has already been delivered \u2014 two containers (34 tons in total) [&hellip;]<\/p>\n","protected":false},"author":5,"featured_media":15203,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[13,1],"tags":[],"class_list":["post-15201","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-uabio-news","category-news"],"views":89,"_links":{"self":[{"href":"https:\/\/uabio.org\/en\/wp-json\/wp\/v2\/posts\/15201","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/uabio.org\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/uabio.org\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/uabio.org\/en\/wp-json\/wp\/v2\/users\/5"}],"replies":[{"embeddable":true,"href":"https:\/\/uabio.org\/en\/wp-json\/wp\/v2\/comments?post=15201"}],"version-history":[{"count":0,"href":"https:\/\/uabio.org\/en\/wp-json\/wp\/v2\/posts\/15201\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/uabio.org\/en\/wp-json\/wp\/v2\/media\/15203"}],"wp:attachment":[{"href":"https:\/\/uabio.org\/en\/wp-json\/wp\/v2\/media?parent=15201"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/uabio.org\/en\/wp-json\/wp\/v2\/categories?post=15201"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/uabio.org\/en\/wp-json\/wp\/v2\/tags?post=15201"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}